Amendment-IV
SPCIFICATION NO. CECT-548/10 FOR SUPPLY OF THREE PHASE RF METERS
Sl.No. Clause.No. Existing Amended as
1 2.1  The supplied CMRI and meter shall use universal definitions such as DLMS/COSEM for interoperability of meters of different design and make Ammended as -" The supplied CMRI and Meters should have interoperability among different make of meters and DLMS compatability as optional."
2 Clause 4,  Sl.No.6  Resistance to Surge Voltage -  6 KV peak for 1 min including latest amendments as per IS 13779 Amended Surge voltage test  as High voltage Test
3 Clause 5.1.6.3 The meter shall draw power for working of electronic circuit from phase and neutral. In case of neutral missing, power shall be drawn from a current transformer on the phase and neutral circuit and not through battery. Clause deleted.
4        5.1.12.2 ,   Note3
The back lit should not glow during power off and single wire condition. Ammended as "The back lit should not glow during power off condition".
5       5.1.12.2 ,   Note 5
If the push button is pressed continuously for 2 minutes during power off condition, then the display should be disabled for 30 minutes.
If the push button is pressed continuously for one  minute  during power off condition, then the display should be disabled for 30 minutes.
6 5.1.12.2 Load Survey parameters - MD Amended the word MD as "Demand"
7 8.0 (b)  The MRI shall have facility to store minimum 4000 nos. of meter’s data. The MRI shall have facility to store minimum 1000 nos. of meter’s data.
8 8.0 (e)    The data downloading time (from meter to MRI) shall not exceed 5 sec for each meter (with +2 sec. max tolerance time). In case of LPR with mesh networking, time of reading for the next layer of meters may vary and the additional time of +3 sec. for each added meter layer i.e. for each hop shall be allowed.       It shall be read as "the billing data downloading time (from meter to MRI) shall not exceed 5 sec for each meter (with +2 sec. max tolerance time). In case of LPR with mesh networking, time of reading for the next layer of meters may vary and the additional time of +3 sec. for each added meter layer i.e. for each hop shall be allowed".    
9 18.2 The meter shall be provided with 2 nos. polycarbonate tamper evident seals which shall be marked with “AP--PDCL”, company logo and shall be additionally laser marked with serial no. matching with that of meter. The serial number of meter is to be laser etched on the base as well as the cover of the meter box The meter shall be provided with 2 nos. polycarbonate tamper evident seals which shall be marked with “AP--PDCL”, company logo and shall be additionally laser marked with serial no. matching with that of meter.
METER BOX
10 5  The top cover of the meter box should be of Non push fit type having at least 4 self locks….  Ammended as, "The top cover of the meter box should be of Non push fit type."
All other terms and conditions of the tender specification remains unaltered. 
                               Sd /-
 CHIEF GENERAL MANAGER/P&MM