| Amendment-IV | ||||||||
| SPCIFICATION NO. CECT-549/10 FOR SUPPLY OF SINGLE PHASE PREPAID METERS | ||||||||
| Sl.No. | Clause.No. | Existing | Amended as | |||||
| 1 | 1.0 | The system should be powered by web based vending system where user has to go to specified site with authorized user name and password. | Amended as ‘ The system should be powered by web based vending system by integrating with the APCPDCL website and web based vending will be done using the payment gateway of APCPDCL only’ | |||||
| 2 | 1.0 | The meter should design in single box with measuring element, dual latching relay for phase and neutral to avoid fraud & disconnect consumer load while credit expire and overloads | Amended as ‘The meter should design in single box with measuring element, dual latching/ Bistable relay for phase and neutral | |||||
| 3 | 1.0 | The “In Home Display” should be in the form of graphical LCD / LED display which displays multi-information with single click in tabular form so that consumer can easily compare the parameters and analyze | Amended as ‘The “In Home Display” should be in the form of LCD / LED display which displays multi-information. | |||||
| 4 | 1.0 | The meter & In Home Display should have bi-color LED for visual indication of credit status and audible alarm for low credit warning and overload | Amended as ‘ The meter & In Home Display should have credit status warning on meter LCD display / LED and audible alarm for low credit warning and overload’. | |||||
| 5 | 12.3 | The meter cover should be transparent, for easy reading of displayed parameters, and observation of operation indicators. | Amended as ‘The meter cover should be transparent/ translucent cover with transparent viewing window, for easy reading of displayed parameters, and observation of operation indicators | |||||
| 6 | 12.4 | The ETBC should not be easily detachable from the base and be secured to the base using a hinging arrangement. ETBC should be closed at the bottom to prevent access for wires to terminal holes, but should have a slot of size 20 mm X 20 mm on extreme right hand side of the bottom of the terminal cover. | The ETBC should not be easily detachable from the base and be secured to the base using a hinging arrangement or ETBC with a centre U-cut without hinging arrangement for proper wire termination is acceptable. | |||||
| 7 | 12.11 | In case of Hall Effect Sensor, meter should record as per requirement of technical specification in normal & tamper conditions and life of battery used for recording & display during single wire operation as per clause 12 (IX) should be guaranteed for 10 years | Clause is deleted | |||||
| 8 | 12.13 | If the top cover is removed, meter should have a permanent indication in its display even in power off condition and it should be remain until reset the tamper through BCS. Permanent display indication also to be provided while any tamper (like current reversal, earth load, Magnetic influence etc.) Occur and should remain until reset the tamper through BCS. Here display means display of meter & IN HOME DISPLAY unit. | The word permanent is deleted. Display indicating the TC opened condition should appear after restoration of supply | |||||
| 9 | 12.14 | Sealing Arrangement: The sealing screws used for the meter cover shall be fixed upside down so that these are tightened from the rear. The sealing screws shall be Tinned Brass or Nickel plated steel. In absence of sealing screws provision of holes on meter body should be kept for sealing purpose. | The sealing screws used for the meter cover shall be fixed
upside down/sealing from top In absence of sealing screws provision of holes on meter body should be kept for sealing purpose. |
|||||
| 10 | 13.0, (subclause i & ii) | i) Phase and neutral connection
reversal with indication of Current reversal in display unit. ii) Incoming mains is connected to outgoing terminals and load is connected to incoming terminals |
For clause ( i) meter should record energy in forward
direction irrespective of direction of
current. For clause (ii) Meter should not power up under this condition. |
|||||
| 11 | 13.0 (subclause vii) | Meter should record energy with maximum error of ± 4% on Injection of DC(+) ve & DC (-) ve in neutral, injection of discontinuous DC (7-10 Hz) in neutral, injection of chopped AC in neutral… | Clause is deleted | |||||
| 12 | 13.0 (sub clause viii) |
During spark discharge test, spark will be applied directly at all vulnerable points of the meter for a period of 20 to 30 min and meter should record under this condition. After application of spark discharge meter should record correctly within the specified limits of errors. Beyond 35 KV meter should record as tamper if not immune (optional). | The test shall be performed for 10 min. Before & after the spark discharge
test, meter accuracy shall be verified and be with in permissible
limit. If the spark is beyond the 35 KV, meter output supply shall be disconnected to protect meter internal circuitry and stamps logged in meter NVM. |
|||||
| 13 | 13.0 (viii), Last para | The meter should be capable of recording the following tamper events in memory (minimum 50 events) with date and time stamp preferably along with snapshots of V, I, PF and KWh. The logging will be on FIFO basis. Earth tamper, Current reversal, Neutral Disturbance, Magnetic Tamper | During current reversal meter should record energy in forward direction irrespective of direction of current and Earth load tamper should be recorded as current imbalance | |||||
| 14 | 13.0 (viii), Last para | The duration of tamper before it is logged should be a user programmable through authenticated commands. But it should not be more than 10 min. | The duration of tamper before it is logged should be a factory programmable. But it should not be more than 10 min. | |||||
| 15 | 14.1 | The LCD should be of STN (Super Twisted Pneumatic) type with
display size area of at least 40 X 15 mm. Backlit also to be provided in Graphical IN HOME DISPLAY. |
The LCD should be of STN/TN (Super Twisted / Twisted Pneumatic)
type with display size area of at least 40 X 15 mm. Backlit in IHD is optional |
|||||
| 16 | 15.1 | The meter should provide following information on the display and the same shall also be available on the split / display unit. | The following parameters should be displayed using the keys (or)
combinations of keys on the key pad. |
|||||
| 17 | 15.1 | 1. LCD Test 2. Real Time & Date 3. Cumulative Active energy (forwarded) reading (kWh) 4. Billing period counts 5. Credit balance in INR 6. The days left based on the last seven days average consumption 7. Consumption of last month. 8. Present slab rate in Rs/ Kwh 9. Maximum demand along with date & time (current month) & last 6 months 10. Average Power factor for current month & last 6 month 11. Average Load factor for last 6 month 12. Instantaneous current (both Phase & Neutral), voltage, p.f., KW etc. 13. TOD wise Energy for last 6 month 14. Tamper count |
1. Real Time & Date 2. Cumulative Active energy (forwarded) reading (kWh) 3. Switch operation counts 4. Credit balance in INR 5. The days left based on the last seven days average consumption 6. Consumption of last month. 7. Present slab rate in Rs/ Kwh 8. Maximum demand along with date & time (current month) on display & last 6 months in memory 9. Average Power factor for current month on display & last 6 month in memory 10. Instantaneous current , voltage, p.f., KW etc. 11. TOD wise Energy for last 6 month in memory LCD test and Tamper counts are optional. Any other value added display is acceptable |
|||||
| 18 | 15.1 | Permanent display with Normal mode should be provided
like; v Supply indication v Relay status current slab number v Current reverse indication (if condition occurred) v Earth load indication (if condition occurred) v Magnet influence (if condition occurred) |
Permanent display with Normal mode should be provided
like: a. Supply indication: This should be available on meter in the form of LCD/LED, which displays the default parameter when meter is powered ON. b. Relay Status: This must be displayed in meter/IHD auto display cycle. c. Current reverse/magnet influence/earth load indication (if condition occurred): This should appear on meter LCD in default display cycle as “TAMPER” or by LED. |
|||||
| 19 | 15.4 (a) | Button 6 or 7 has physical identification of raised printing | Button 5 has physical identification of raised printing to aid consumer having poor sight | |||||
| 20 | 15.4 (d) | Cumulative KWh” & “Account balance” should be displayed regularly on IN HOME DISPLAY unit with current date and time to avoid sleep mode. | Account balance” should be displayed regularly on IN HOME DISPLAY unit with current date and time with sleep mode. Cummulative KWH in IHD is optional. | |||||
| 21 | 15.5 | Keypad Display | Key Pad display is at the discretion of Manufacturer but the information of the respective keys on the key pad will be available to each consumer in the form of handout. | |||||
| 22 | 16.1 | Data Storage: The meter should be capable of storing the
following parameters in NVM 1. Billing parameters like Active KWh, MD in KW and PF for last 6 months 2. Consumption details of previous 6 months in term of Rupees. 3. Cumulative Active Energy 4. Time of use of energy & MD 5. Tampers up to 50 events on FIFO basis |
Consumption details of previous 6 months in term of Rupees must
be available on display or in
memory Time of use of MD is optional. The meter shall have provision recording parameter such as V, I, KWh etc. for every 30 min. |
|||||
| 23 | 23.0 | There should be adequate clearance of the test output from other outputs (LED / LCD for earth, for reverse, for power on etc) so that there is no interference of other outputs while performing accuracy test with standard scanners. | Information of the Tamper should be available on the meter LCD display/LED | |||||
| 24 | 25.0 | Customer Interface unit should have high resolution graphic display which should be user friendly and provides a host of information to the consumers in tabular format with single key | Customer Interface unit should have high resolution graphic/ normal LCD display which should be user friendly and provides a host of information to the consumers in tabular format with single key. | |||||
| 25 | 26.0 | Token and Credit Amount: The online single token could be generated up to 1Lakh INR and the same debit limit should be provided into the meter | The online single token could be generated up to 0.5 / 1.0 lakh INR and the same debit limit should be provided into the meter | |||||
| 26 | 26.0 (sub clause j ) |
It shall be possible to define the minimum charge for the applicable tariff category. | It will be defined seperately by the utility at the time of supply. | |||||
| 27 | 26.0 (e) | Slab and TOD boundaries should be defined instantly(Today itself) in desired range. | Slab and TOD boundaries should be defined by midnight(Today itself) in desired range. | |||||
| 28 | 27.0 (i) | A visible low credit warning should be provided with bi-colour LED indication (prefer Green while for healthy zone else Red colour) when the credit falls below defined alarm limit. | The meter & In Home Display should have credit status warning on meter LCD display / LED and audible alarm for low credit warning and overload. | |||||
| 29 | 27.0 (j) | An audible low credit warning should be provided to make sound after every half hour duration for 30 second till the alarm is acknowledged by consumer by pressing either meter or IN HOME DISPLAY unit. | An audible low credit warning should be provided to make sound after every half hour duration for 30/120 second till the alarm is acknowledged by consumer by pressing either meter or IN HOME DISPLAY unit. | |||||
| All other terms and conditions of the tender specification remains unaltered. | ||||||||
| Sd /- | ||||||||
| CHIEF GENERAL MANAGER/P&MM | ||||||||